You’ve signed the booking form, paid the advance and taken the floor plan home. Now you’re looking at it with fresh eyes. The study needs one more socket for a printer. The kitchen counter looks short. There’s a blank wall that would make a perfect wardrobe. So the question comes up: can you still change things?
Often, yes. But it depends on what you want to change and how far construction has progressed. Apartment modifications after booking usually fall into three groups: small interior changes that builders can accommodate, changes that need a technical check, and changes that aren’t possible because they affect the structure, other residents or the approved building plan.
This guide walks through each group with everyday examples, explains why timing matters so much, and lists the questions to ask before you request any changes to an apartment after booking.
An apartment building is designed as one system. The columns, beams and slabs carry the load of every floor. Drainage pipes run vertically through all the flats in a stack. The electrical supply is planned for the whole tower. A change inside one flat can affect the flats above and below it.
There’s also a legal side. If you’re buying one of the new apartments in Trivandrum, the project is built to plans sanctioned by the local authority and registered with K-RERA, Kerala’s real estate regulator. Under the Real Estate (Regulation and Development) Act, 2016, a builder must develop the project as per those sanctioned plans. The Act does allow minor additions or alterations that a buyer requests. Larger changes to the building plan or common areas need the written consent of at least two-thirds of the allottees.
The Act doesn’t list exactly what counts as “minor”. In practice, the builder’s architect and structural engineer decide what can be done safely. That’s why the same request might be approved in one project and declined in another.
These are apartment interior modifications that don’t touch the structure or shared services. Most builders handle them as long as you ask before the relevant work starts.
Say you plan to work from home and want two extra sockets and a network point in the study. Or you’d like the bedroom light switch next to the bed instead of the door. Wiring in most apartments runs through concealed conduits laid inside the walls and slabs. If you ask before conduit work and plastering, adding or shifting a point is simple. After plastering, it means cutting walls, which is messy and leaves patch marks.
Expect a charge per additional point. Ask for it in writing.
Many builders offer a range of tile or flooring options for living areas, bedrooms and bathrooms. Choosing a different option from that range is usually straightforward. Upgrading to a costlier tile normally means paying the difference. Some builders also allow you to supply your own material, though they may not take responsibility for its quality.
Swapping the standard wash basin, taps or shower fittings for a different model is a common request. It’s easier when the new fitting uses the same plumbing points. A wall-hung toilet in place of a floor-mounted one, for example, needs a concealed cistern planned in advance.
Most wardrobes and kitchen cabinets are added after possession by an interior designer. Still, a little planning during construction helps. You can ask for an electrical point inside a wardrobe niche for a light, or for a socket at the right height for a built-in microwave. If the project includes concrete lofts or shelves, ask early whether their size or position can change, because they can’t be altered once cast.
Internal wall colours are often the easiest choice to change, especially if the builder hasn’t applied the final coat yet.
Change | Usually possible? | Ask before |
Extra sockets or shifted switches | Yes, with a charge | Conduit work and plastering |
Different tiles from builder’s range | Yes, upgrades cost extra | Flooring and tiling |
Different sanitary fittings | Often | Plumbing first fix |
Wardrobe and storage provisions | Yes | Plastering (for electrical points) |
Internal paint colours | Usually | Final painting |
These apartment construction changes may be possible, but the builder’s engineers have to check them first. Some will be approved with conditions; some won’t.
A buyer might want an L-shaped kitchen instead of a parallel one, or the sink under the window. Moving a sink means moving water and drain lines, and drains need a proper slope to work. Moving the hob can affect a piped gas line and the chimney exhaust opening, which sits on an external wall. If shifting that opening changes the building’s outer face, it’s unlikely to be approved. Extending a counter along the same wall is far simpler than changing the layout.
Many buyers want to open the study into the living room or make a bedroom slightly larger. Whether this is possible depends on how the building is constructed. In a framed structure, some internal walls are non-load-bearing partitions and may be adjustable. In buildings made with shear walls or aluminium formwork, many internal walls carry load and can’t be touched at all. Ask the project team which method your building uses.
Shifting a toilet or shower to another corner of the bathroom affects drainage, floor slope and waterproofing. Bathrooms usually sit directly above the bathrooms of the flat below, and the drain stack runs through them all. Small shifts may be possible early on. Moving a bathroom into a different room almost never is.
An extra air-conditioner point in a third bedroom, an EV charger in your parking slot or an induction hob all add load. Each apartment has a planned electrical load, so these requests need the electrical consultant’s approval.
Some requests are almost always declined, however early you ask:
These aren’t about the builder being difficult. They affect safety, other residents and the approvals the building needs for its completion and occupancy certificates.
The single biggest factor is timing. Every change has a last possible stage, and once that stage passes, the change either becomes expensive or impossible.
Many builders set a cut-off date for customisation requests for each tower or floor. Ask for this date at booking, and put a reminder on your calendar.
A clear process protects both you and the builder.
If customisation matters to you, ask these questions before you pay the booking amount:
The answers tell you how much flexibility you’ll really have.
Most disappointment around apartment modifications after booking comes from asking too late. The easiest changes are the ones discussed before construction reaches that stage, and the best time to start that conversation is before you book.
If you’re comparing flats in Trivandrum, think about how you’ll actually use each room. Maybe you need a proper home office, a kitchen that suits the way your family cooks, or more storage than a standard plan offers. Shanoor Homes develops residential projects in Trivandrum, and its project team can walk you through the floor plans, the specifications and the customisation options available in each project.
Whether you’re looking at 3 BHK apartments in Trivandrum for a growing family or a smaller home closer to work, share your space requirements with the team before booking. You’ll know exactly what’s possible, and you can plan your home with confidence.
Explore Shanoor Homes’ apartments in Trivandrum, or book a site visit to discuss your customisation preferences with the project team.
In many under-construction projects, yes. Small interior changes like extra electrical points, different tiles or fittings are often possible if you ask before that stage of work begins. Structural changes and anything that affects the exterior or common areas are usually not allowed.
Before booking, or as soon as possible after it. Each change has a cut-off stage. Electrical changes, for example, are easiest before plastering, while tile choices must be made before flooring work starts.
It depends on whether the wall carries load. Some partition walls in framed buildings can be adjusted with engineering approval. In shear-wall construction, most internal walls are structural and can’t be removed.